Antique Lightning Rod Section (Scroll) Brace
Solid Copper Construction. Available with a ceramic insulator or without. All Braces are shipped with the legs straight so they can be “field formed”.
Available In:
-
-
-
- 18″ H – 3 Leg Non-Insulated; 4 Leg Non-Insulated – lead time 6 to 8 weeks
- 18″ H – 3 Leg Insulated; 4 Leg Insulated – lead time 6 to 12 weeks
-
-
-
-
-
- 30″ H – 3 Leg Non-Insulated; 4 Leg Non-Insulated – lead time 6 to 8 weeks
- 30″ H – 3 Leg Insulated; 4 Leg Insulated – lead time 6 to 12 weeks
-
-
.
Reviews
There are no reviews yet.